Vancouver Laneway Homes

Vancouver Laneway Homes

kerr construction laneway homes

On July 28, 2009, the City of Vancouver approved Laneway Homes to be built on lots where normally a garage would be placed.

Vancouver and other cities in the Lower Mainland have found that building laneway homes create an excellent source of affordable rental homes for urban residents in an environmentally sustainable manner.

Laneway Homes Offer Supportable Eco-Density

Part of the reason behind this project is the effort to provide more housing for people wanting to live in Vancouver.  In the drive for eco-density, this type of building provides an affordable self-contained second home on a single-family lot, while giving privacy and green space to all occupants. A rented laneway house can also provide an additional source of income for the homeowner.

A Laneway House For Aging Family Members/Young Families

Building a laneway home on an existing lot is a good way to care for aging family members, or accommodate the need for affordable living space for young families.

The Vancouver Heritage Foundation has stated that these small homes have become popular among those dealing with the challenges of affordability ... “with rising housing costs, the laneway house has become a popular alternative for urban couples looking to move out of parents’ basements or highrise rentals.”

Financial Benefits in building a Laneway Home

The Vancouver Heritage Foundation also noted that laneway homes can provide financial benefits for the owner of the property’s main residence. “Built behind existing homes, these structures offer added income for the owner, can be a great rental option for young families, and preserve historic homes by infilling rear yards, which allows for gentler densification versus demolition and new builds.”

Laneway Homes

Vancouver Laneway Homes Requirements:

  • RS-1 and RS-5 Single Family areas
  • Lots 33’ wide and wider with an open lane, on a double fronting street or on a corner with a lane dedication
  • Unit within the area on the rear 26’ of the lot with a minimum 16’ separation between the laneway home and the main house
  • Rental or Family only no strata titled
  • Minimum of one on-site parking space
  • Unit size will be based on the lot size with a maximum of 750 sq ft
  • 1 and 1 ½ story configurations are acceptable

More Laneway Home Related Articles

How We Make Things Better for Our Clients

November 19, 2019
Doug Kerr, founder of Kerr Construction & Design, is proud of the lengths our company will go to improve a client's project in even small…

Caring For the Client Means Thinking About the Small Things Too

September 25, 2019
One of the things that make Kerr Construction & Design one of the most trusted and popular builders and renovators in the Lower Mainland is our ability…

“The Process” is the Most Important Factor in Home Renovations

July 29, 2019
In many ways, undertaking a major renovation is like buying your first home. It is not something you have done before. So despite everyone's advice,…

Laneway Homes – A Great Investment for Homeowners

July 17, 2019
Just because the real estate market in Vancouver is not as hot as it once was, does not mean that the housing supply for the…

If you are interested in finding out more about laneway homes, you can talk to one of our project consultants without obligation. Just fill out the form below.

WHAT THEY SAY

Some Testimonials from Our Past Clients

Fixing water damage at my house and doing some renovations. Great work - would recommend Kerr Construction came out and fixed a water leak I...

S.W., Richmond

HomeStars Review

Kitchen Renovation. All trades were wonderful, cleaned up every day, on time, pleasant to have around, and the finished product was totally up to our...

AGS, Westside

HomeStars Review

House Renovation. Good comprehensive work on project from initial discussion of concepts to architectural design to execution to lockup. Work was well done and has...

M, Vancouver

HomeStars Review

It is a pleasure to recommend Kerr Construction whom we have known through a major renovation contract last year. We are quite impressed with his...

I & M, Vancouver

We would like to thank you for renovating the bathroom of our 60 year old house. The work was essentially completed within three weeks as...

B & E, Vancouver

I would like to compliment you on getting the painting and alterations done on time and on schedule. As you know, we use this building...

B.M., Vancouver

As the owner of a forty-unit apartment building located at 230 Ash Street in New Westminster, we have recently replaced the entire building envelope. In...

G.B., Vancouver

This letter will confirm that Kerr Construction has done many jobs for the Justice Institute and we have found his work to be of first...

P.W., Vancouver

Good Job overall! The job was for a reno of the bathroom. The job was done overall very well … the contractor was friendly and...

Aatma, Coquitlam

HomeStars Review

Renovation of decks. The work was performed on time. I was always kept informed of their progress. The quality of the work was very good...

Neil, Kitsilano

HomeStars Review

HOW WE WORK

Our Projects Run Smoothly,
On Budget and On Schedule

We know that keeping projects on budget and on
schedule makes a successful home renovation or
new building construction

SCHEDULE A CONSULTATION

HOW WE WORK

Detailed Planning,
Skilled Workmanship

At Kerr we think through all the little details
and how things will function, like which way doors
will swing on the cabinets or the fridge

SCHEDULE A CONSULTATION

HOW WE WORK

The Homeowner is
Part of the Process

This puts the homeowner in control
and is the best way to make sure they
are getting the most value out of their project

SCHEDULE A CONSULTATION
kerr construction project
kerr construction project
kerr construction project
kerr construction project
kerr construction project
kerr construction project

Call Now
Directions